The main floor is finished

The new basement

Laying out the structural steel members


The first columns going up




Installing the first cross beam





Connecting columns


Installing the girts and perlins


The main structure is taking shape


Framing the exterior walls


The main roof is on!

Connecting to the existing building

Installing the exterior sheathing

Installing the storm sewer/roof drain system

Even though the roof is on, we still have a little leak! I don't remember it raining.

Framing the front of the chancel

Framing the rear of the new sanctuary

Looking west in the narthex area

The front of the sanctuary

The elevator shaft

The dry wall is going up. The openings are for the organ


Looking out of the mezanine into the sanctuary


Framing for the "clouds"


Dry wall in the narthex

Framing the new doorway into the existing building